FAA Part 145 Repair Station 54RR449D AOG 24/7 · 954-806-2994

Electrical power · Component repair & overhaul

DC Starter-Generator Repair and Overhaul.

Seventy-one approved starter-generator listings under FAA Part 145 certificate 54RR449D, released on FAA Form 8130-3, with a published 11 to 14 day average overhaul and a 24/7 line when the aircraft cannot wait.

Component test equipment at Sunshine Air Repairs, Plantation, Florida
71approved starter-generator listings
11–14day average overhaul
8130-3FAA release for eligible work
24/7direct AOG response

Published turn times are averages, not guarantees. Actual timing follows incoming condition, approved work scope and parts availability. Read the full notice.

Approved scope

Find your part number.

Every listing below is inside Sunshine Air Repairs' approved capability. Select a part number to send it straight to the quote form, already filled in.

200SGL series37 listings

  • 200SGL111Q
  • 200SGL111Q-2
  • 200SGL111Q-3
  • 200SGL112Q
  • 200SGL114Q
  • 200SGL115Q
  • 200SGL115Q-2
  • 200SGL117Q
  • 200SGL118Q
  • 200SGL119Q
  • 200SGL119Q-2
  • 200SGL120Q
  • 200SGL121Q
  • 200SGL124Q
  • 200SGL129Q
  • 200SGL129Q-1
  • 200SGL129Q-3
  • 200SGL129Q-4
  • 200SGL129Q-5
  • 200SGL129Q-8
  • 200SGL130Q
  • 200SGL131Q
  • 200SGL131Q-2
  • 200SGL131Q-5
  • 200SGL132Q
  • 200SGL132Q-2
  • 200SGL132Q-3
  • 200SGL132Q-4
  • 200SGL132Q-5
  • 200SGL142Q
  • 200SGL144Q
  • 200SGL145Q
  • 200SGL147Q
  • 200SGL147Q-2
  • 200SGL147Q-3
  • 200SGL151Q
  • 200SGL153Q

23048 series18 listings

  • 23048-001
  • 23048-004
  • 23048-004M
  • 23048-004T
  • 23048-004TM
  • 23048-006
  • 23048-008
  • 23048-009
  • 23048-016
  • 23048-017
  • 23048-018
  • 23048-020
  • 23048-021
  • 23048-022
  • 23048-023
  • 23048-027
  • 23048-028
  • 23048-046

23046 series8 listings

  • 23046-001
  • 23046-007
  • 23046-007M
  • 23046-009
  • 23046-017
  • 23046-019
  • 23046-020
  • 23046-028

23080 series5 listings

  • 23080-013
  • 23080-013A
  • 23080-13B
  • 23080-014
  • 23080-014A

30081 series2 listings · auxiliary units

  • 30081-001
  • 30081-010

23078 series1 listing

  • 23078 Series

Not on the list

No starter-generator listing matches that.

A missing dash number is not a no. Send it and Sunshine Air Repairs will confirm whether it can be quoted now or should enter technical evaluation.

What comes back

The unit, and the paperwork for where it is going.

Release eligibility follows the applicable approval, the work scope and the conditions stated on the certificate.

  • FAA Form 8130-3 is the authorized release document for eligible work under certificate 54RR449D.
  • EASA (EASA.145.6835) and UK CAA (UK.145.50900) references may be included when the applicable bilateral conditions are satisfied.
  • CAAN Nepal (AMO/VAL/255/2025) is a validation of the FAA certificate, not a dual-release authority.
Review the approval documents

The rest of the electrical system

When a charging fault is chased down, the surrounding units usually come off with it. These are inside the same approved scope.

Converters

76 approved listings across converter types in the accessories rating.

Search converters

Static inverters

22 approved listings. Published average for static inverter work is 2 to 3 days.

Search inverters

Generator control units

Generator and DC control units within the approved accessories scope.

Search control units

DHC-6 Twin Otter

Airframe, instrument, fuel and actuation support for the platform behind most of this work.

Explore Twin Otter support

Everything else

1,085 approved listings across accessories, instruments, airframe and radio.

Search the full list

Before you send the unit

Starter-generator questions.

Do you overhaul the starter-generator, or only bench-test it?

Sunshine Air Repairs is an FAA Part 145 repair station rated for accessories, and starter-generator overhaul is inside that approved scope under certificate 54RR449D. The exact work performed on your unit follows the approved technical data and what incoming evaluation finds.

How long does an overhaul take?

The published average is 11 to 14 days. That is an average and not a guarantee: actual timing follows incoming condition, approved work scope and parts availability. If the aircraft is grounded, call the AOG line at 954-806-2994 rather than waiting on email.

What paperwork comes back with the unit?

For eligible work, FAA Form 8130-3 is the authorized release document. EASA (EASA.145.6835) and UK CAA (UK.145.50900) references may be included when the applicable bilateral conditions are satisfied. The CAAN Nepal reference is a validation of the FAA certificate, not a dual-release authority.

My dash number is not on the list. Is it worth sending?

Yes. The list reflects current approved scope, not the limit of the conversation. Send the part number and Sunshine Air Repairs will confirm within one business day whether it can be quoted now or should enter technical evaluation.

Can you support a recurring starter-generator requirement?

Where fleet demand justifies the investment, Sunshine Air Repairs can evaluate what would be required to add support, including approved data, tooling, testing and regulatory requirements. Send the part number, aircraft application, annual removal volume and the current support problem.

Do you overhaul the engine as well?

No. Sunshine Air Repairs supports components and PT6 accessories. Engine overhaul is outside our scope.

Still unanswered? Call the office at 954-317-0086 or send the part number.

Sunshine Air Repairs will confirm the repair path and next steps within one business day.

Call AOG 24/7 Send a part number